Welcome-Kit Inventory Planner
Plan welcome-kit stock for your next hires
A shelf full of boxes is not a shelf full of complete kits. Check the contents against your next group of hires and prepare a replenishment brief.
Download a blank CSV brief to fill in manually. Review the details before sharing it with Teal.
Boxes are only one component.
The lowest available component count limits complete kits. Incoming stock counts only if confirmed and due by the assembly deadline.
Plan your next welcome-kit order
Download the procurement plan and attach it to your email. Teal can review the packaging, kit contents and replenishment quantities for your next group of hires.
Email your brief to Teal ↗Attach the CSV in your email app. Your brief is not sent from this page.
A January example you can reproduce
In the fictional January 2027 example, the first group needs 40 kits, with 45 available after retaining buffers. The second group needs 35, with 30 available. Boxes limit the second group. The entered 50-box minimum produces a 50-box purchase suggestion, not confirmed replenishment. Use “Load January example” to inspect the inputs and export the result.
How stock carries forward
For each component, net eligible stock is usable stock minus existing allocations plus eligible confirmed inbound. Procurement gap is demand plus your target ending buffer, minus net eligible stock, with a floor of zero. The target buffer is replenished even when already depleted.
Cohorts run in date order. Each uses the remaining stock, and an inbound delivery is counted once. Unfilled demand carries as a negative balance. Suggested purchases are not treated as received. Later suggestions include earlier unresolved shortages, so do not add all cohort suggestions together. Resolve earlier procurement and rerun the plan.
Variant quantities must be known. This planner does not infer apparel sizes, available warehouse labor or a guaranteed dispatch date. “Confirmed” and “forecast” cohorts both reserve their entered demand, with their status retained in the output.
How much onboarding-kit inventory should HR hold?
Base the plan on confirmed and forecast hiring cohorts, the components each kit consumes and a buffer your team has chosen. There is no universal stock quantity that fits every hiring program. A buffer is a planning input, not a measured service guarantee. Revisit it when demand, supplier lead times or the cost of a late kit changes.
Use a separate variant for each recipe that consumes different components. If an apparel size is unknown, the planner cannot prove that the right kit is available. Collect the choice through your approved employee workflow or use an approved size-independent option; do not invent a size distribution to make the totals balance.
| Exception | Update the plan | Confirm with the owner |
|---|---|---|
| Start date moves | Move the assembly deadline and rerun all affected cohorts. | People Operations confirms the new arrival requirement. |
| Hire cancels after reservation | Release the allocation only after cancellation is confirmed. | Operations checks whether the kit has already been assembled or shipped. |
| Incoming stock is late | Update the due date or remove its confirmed status. | Procurement obtains a revised receipt commitment. |
| Wrong size or damaged item | Exclude unusable stock and review the affected recipe. | The program owner approves a substitute or replacement. |
| Office asks for shared stock | Allocate those units before promising the same stock to home shipments. | One stock owner reconciles the total across destinations. |
Shared stock cannot be promised twice
Consider a fictional component with 80 usable units, no existing allocation and a target ending buffer of 10. A first cohort consumes 40 units. Physical stock becomes 40, of which 30 is available while retaining the buffer. A second cohort needs 35, so the procurement gap is five units. After that demand, the modeled balance is five, below the target buffer.
If the confirmed supplier minimum is 50 and its order increment is one, the suggestion is 50 units. It is still a suggestion. Until the receipt is confirmed with an eligible date, those units do not repair the plan. This example assumes one component per kit and no inbound stock; other components can become the limiting factor.
Use an assembly deadline for each cohort
Start with the required arrival date. Agree the dispatch allowance and the time needed for receiving, checks and assembly with the people doing the work. Enter the resulting assembly deadline here. Stock readiness does not establish warehouse capacity, carrier performance or employee receipt. Carry the planned sends into the annual employee gifting budget planner when comparing this cohort with the rest of the year.
Should forecast hires use real stock in the plan?
This tool reserves entered demand for both forecast and confirmed cohorts. Keep the labels accurate, review changes regularly and rerun a separate scenario if you need to see confirmed demand alone. Do not subtract forecast reservations a second time in the allocations field.
Can one shared component support several kit variants?
Yes. Use * for the shared component and list the variant-specific pieces separately. If stock is physically held at different warehouses, run separate location plans unless those units can actually be transferred before the relevant deadline.