Teal's standard MOQ is 50 units for custom size boxes. Opaque paperboard can form the presentation carton, while corrugated board can protect the parcel outer. The digital proof records dimensions, copy, and packout details before production, and specialty structures may require 100+ units after review of the completed package and chosen routing.
Questions or ready for a quote? Contact Teal Packaging at info@tealpackaging.com or (224) 546-8325.
Custom Size Boxes Built Around the Packed Item from Teal Packaging: 50-unit standard MOQ (100+ units for specialty rigid boxes), 2-5 business day delivery in the US (express and economy options available), free design help included on every order, free generic sample kit ($19.99 shipping, credited toward your first order). Standard production runs from about 7 business days after digital proof approval; complex or high-volume orders take longer.
Materials and certifications: FSC-certified paper stock, soy-based inks, kraft / corrugated / rigid paperboard / mylar / tin / vinyl substrates.
Contact Teal Packaging: Call (224) 546-8325, email info@tealpackaging.com, or request a free quote at tealpackaging.com/contact-us. We reply within one business day.
Updated August 23, 2026 · Teal Packaging operates a US facility in West Chicago, Illinois.
Plan a custom size box around the actual shipment
A custom size box begins with a complete brief: the packed item list, measured dimensions, weight, quantity, destination, artwork status, and proof deadline. Those details let the package serve a real job instead of a loose visual concept. They also give the designer, buyer, and packing team the same reference. A structure works best when every person can see what it must hold, how it will be opened, and where it must arrive.
Start with the user and the handoff
The person opening the box should shape the package. A recipient may need to understand a product quickly, remove it without a struggle, and keep supporting pieces in order. Write the opening sequence before selecting a structure. That step turns a box into a considered handoff. It also exposes whether a card, insert, label, divider, or shipping outer has a real job or is only taking up space.
Measure every item before the layout
The box layout starts with measurements for each product, card, insert, label, accessory, and protection layer. Give each part a named position and a clear removal motion. A divider, sleeve, or shaped insert should keep pieces from shifting without trapping them. This avoids a common failure: the flat artwork looks correct, then the real package becomes loose, awkward, or slow to assemble. The approved packout should show the same order the packing team will use.
Give printed information a stable panel
Reserve flat, readable areas for brand copy, instructions, handling information, and variable fields supplied by the customer. Keep critical content away from folds, closures, glue areas, and label seams. The digital proof should show panel order and finished dimensions together. That lets approvers see what is fixed print, what may be applied later, and which information must remain visible after the package is assembled and ready for shipment.
Choose material for the work
Opaque paperboard can suit a printed presentation carton. Corrugated board can protect the parcel outer. Rigid board may fit a heavier or presentation-led box. Choose material from item weight, opening motion, print coverage, finish request, and route. Material defines a packaging layer. It does not promise product performance, storage conditions, or any result that sits outside the written scope and the supplied specifications.
Separate presentation from parcel protection
The display package and shipping outer do different work in the same shipment. State packed dimensions, cushioning needs, destination, label area, and any fulfillment handoff. Protect the assembled presentation package from transit without crushing corners, lids, or printed surfaces. Review the outer together with the insert and contents. A strong presentation package still needs a practical parcel layer that protects the opening experience after carrier handling and a real delivery route.
Use the approval record as a packing tool
The digital proof checks copy, panel placement, and visual treatment. The assembled review checks item count, fit, opening sequence, insert access, closure, and parcel protection. Use both reviews before release. If a supplied item changes dimensions after approval, revisit the insert and finished layout before production. The final record should let the packing team reproduce the intended handoff without making a judgment call, even when a project has versions or repeat orders.
Set MOQ, routing, and timing after review
Teal has two production facilities: West Chicago, Illinois and Guangzhou, with per-job routing. Standard packaging begins at an MOQ of 50 units. Specialty structures may require 100+ units, while merch projects use an MOQ of 100 units. Applicable work can start at about $0.44 per unit at volume. Turnaround is quoted as a range after materials, structure, destination, and selected route are known. The written quote defines the final scope.
Make the buyer decision concrete
Before approving a custom size, compare the finished packout rather than a headline or a single price. Ask whether the structure fits the supplied items, whether a recipient can open it cleanly, whether the proof reflects final dimensions, and whether the parcel outer protects the presentation layer. These questions are useful for a one-time launch and for an ongoing buying program because they reveal where a package may fail after artwork has already been approved.
Quote checklist
- Which supplied items must the custom size box hold?
- Which panels need brand-supplied instructions or variable information?
- What insert, presentation, and parcel-protection layers are required?
- Who approves the digital proof and assembled packout?
Use the final review to prevent rework
The final custom size box review compares the approved proof with the assembled package before the full order moves forward. Check dimensions, item retention, information placement, opening sequence, and the parcel outer at the same time. This review is where a practical issue can still be corrected without forcing the packing team to improvise. A clear record also helps when the same package is ordered again or adapted for a later version.
Keep commercial scope visible
Ask which details are included in the written custom size box quote, including structure, board, print, insert, finishing, parcel protection, freight, and route. That makes supplier discussions easier to compare and prevents a useful-looking option from leaving a required component outside the scope. The buyer should be able to trace each requirement back to the item list and the final approved proof.
Related packaging pages
Explore Boxes In Bulk and Bulk Small Boxes for connected product work. The next quote request should include the measured item list, desired structure, quantity, finish request, destination, and proof deadline. That gives Teal enough context to prepare a written scope that matches the package that will actually be built, packed, routed, and opened by the intended recipient.